How Many Loads of Sand and Granite Do You Need for a 3-Bedroom Bungalow in Lagos?

“Buy four trips of sand and two trips of granite” leaves two questions unanswered. How much material does your bungalow need, and how many tonnes will each truck deliver?

Start with the drawings and a measured material schedule from your quantity surveyor or engineer. Three bedrooms can fit into different footprints, with different foundations, wall lengths, concrete elements and finishes. Those details determine the quantities. Once you have them, converting tonnes into planned deliveries is straightforward.

Agree what one load means

Ask for the material specification and agreed tonnes on the quote. A truck description helps arrange access, while a weighbridge record gives the recorded load weight. Confirm the actual vehicle proposed for the delivery with the supplier.

Pamitadz lists a standard rate for 20-tonne aggregate loads. Larger listed loads have Howo and Trailer options. Select a vehicle that can reach the unloading point and confirm the ordered tonnage. For aggregate orders of 20 tonnes and above, supply comes directly from our quarry partners. Smaller aggregate orders come from our pile-down stock.

1. Foundation, DPC and the ground floor slab

List the concrete needed for the foundation footings, blinding where specified, ground beams and oversite slab, often called the German floor. Measure each element from the approved details. Record filling, compaction layers, hardcore and block-laying mortar as separate items.

A worked slab-volume example

Suppose the drawings show a rectangular slab 10 metres long, 16 metres wide and 125 millimetres thick. Converting the thickness to metres gives 0.125 metres.

10 × 16 × 0.125 = 20 cubic metres of geometric concrete volume.

The dimensions in this example illustrate the calculation. Your structural designer specifies the slab thickness. Your project team should check formed dimensions and agree any ordering allowance. The American Concrete Institute describes using length, width and thickness in consistent units when estimating rectangular concrete volumes. ACI concrete ordering guidance

To determine the sand and granite for that concrete, use the approved mix quantities per cubic metre. For each ingredient, multiply its specified kilograms per cubic metre by the concrete volume, then divide by 1,000 to express the result in tonnes. Your concrete supplier or engineer should confirm how moisture and the batching method are accounted for. ACI discusses aggregate properties and moisture adjustments in concrete proportioning. ACI guidance on aggregates and proportioning

For filling below the slab, have the team establish the required levels, material, compacted thickness and compaction requirements. Ground conditions and foundation design need assessment for the actual plot, including sites in Ajah, Lakowe, Ikorodu and other Lagos corridors.

2. Blockwork, lintels, columns and beams

Measure mortar from the wall dimensions, block type and specified joints. Measure concrete for lintels, columns and beams from the structural drawings. Keep the quantities separate so you can see which sand goes into mortar and which goes into the approved concrete mix.

Record whether blocks will be purchased or made on site. If the material schedule includes on-site block production, identify that sand separately. Count openings, wall heights and internal partitions from the drawings before ordering.

Ask the engineer to specify the aggregate size and grading for each concrete application. Write that specification on the quote. For the testing records to prepare before casting, see our guide to LSMTL material testing in Lagos.

3. Rendering, plastering and floor screeding

For wall finishes, measure the internal and external surfaces to receive rendering and use the specified thickness. For screeding, measure the floor area and thickness required by the floor build-up. Get the sand grading approved for each mix and keep the finishing-sand requirement separate in the schedule.

Tell the supplier the intended use when asking for sharp sand or sharpsand and plaster sand. Confirm the grading and cleanliness requirements with your project team. Our sand selection guide explains the common product names.

Build one schedule, then plan the deliveries

What to measure before requesting tonnes and delivery prices
StageQuantities to establishOrder details to confirm
Foundation and oversiteConcrete volume, mortar, filling and specified base layersApproved concrete mix, aggregate grading, filling material and sampling plan
Walls and structural elementsBlockwork mortar and concrete in lintels, columns and beamsWhether blocks are bought or made on site, batch quantities and planned pours
Rendering and screedingSurface areas, specified thicknesses and mix requirementsSuitable sand grading, storage and delivery dates
External worksDrainage, paving bases, fences and other separately designed workItems included in the house estimate and items priced separately

Convert a measured schedule into loads

For illustration, assume your project team has already measured a requirement of 46 tonnes of sharp sand and 32 tonnes of granite for a particular stage. At 20 tonnes per load, those amounts equal 2.3 sand loads and 1.6 granite loads. The supplier should quote the proposed delivery combination, including the balance quantities.

Those assumed totals demonstrate delivery arithmetic. Use the quantities measured for your own bungalow when booking. Ask your team to identify any allowance already included in the schedule so the same allowance is applied once.

Four checks that help control the bill

  1. Order by the construction programme. Book materials for the active stage and confirm the next pour. Keep separate stockpiles where different grades need to be identified.
  2. Protect the unloading area. Agree a storage position within the site, clear of drains and access routes. Plan how stock will be contained and used.
  3. Check truck access. Give the supplier gate clearance, approach conditions, turning space, overhead restrictions and culvert details. Have the site team and delivery operator agree a suitable vehicle and safe unloading point.
  4. Record each load. Match the truck and date to the delivery note. For weight-based orders, compare the recorded net tonnage on the weighbridge ticket with the agreed quantity.

Get a delivered quote for your bungalow

Send Pamitadz the material specification, measured quantity, exact address, required date and truck-access details. We supply sand and granite to homeowners, contractors and other suppliers across Lagos. Our delivery hub includes 41 priced locations, and we can assess enquiries for other destinations.

We share loading photos or video and provide invoices, delivery records and weighbridge tickets for materials sold by weight. Standard LSMTL aggregate grading reports are available for bulk orders only. Agree your project’s documentation requirements before dispatch.